您好,歡迎訪問禹城泰瑞彩鋼復(fù)合板加工廠!

服務(wù)熱線

18765446878

熱門關(guān)鍵詞:禹城彩鋼廠,禹城彩鋼復(fù)合板,禹城鋼結(jié)構(gòu)板房 彩鋼板房

彩鋼活動(dòng)房對裝配地點(diǎn)和環(huán)境的要求

來源:http://www.yunhu3.com 日期:2021-06-16 發(fā)布人:
彩鋼活動(dòng)房現(xiàn)在很常見了,雖然重量輕,但構(gòu)造全體性佳,抗震性佳,房子可多差拆裝,屢差運(yùn)用率高。要注意的是,在彩鋼活動(dòng)房對裝配地點(diǎn)和環(huán)境是有一定要要求的。
Color steel activity room is now very common, although the weight is light, but the structure of the whole is good, earthquake resistance is good, the house can be more poor disassembly, repeatedly poor utilization rate is high. It should be noted that in the color steel activity room, there are certain requirements for the assembly site and environment.
1.地基的硬度:在澆注底子前,要事前測量佳地基的硬度,如有地形特殊或地基硬度相次太大,務(wù)必作特殊處理,以確保板房能順利裝配和保障裝配后的質(zhì)量,如何特殊處理,與技能部溝通。
1. Hardness of foundation: before pouring the foundation, it is necessary to measure the hardness of the foundation in advance. If the terrain is special or the hardness of the foundation is too large, special treatment must be done to ensure the smooth assembly of the prefabricated house and guarantee the quality after assembly. How to deal with the special treatment, communicate with the skill department.
2.底子的程度:在底子澆注時(shí),必定要測量佳程度,底子澆注完后,程度誤次操縱在10MM以內(nèi)。
2. The degree of the base: when the base is poured, it is necessary to measure the good degree. After the base is poured, the degree of error control is within 10 mm.
3.混泥土標(biāo)號:大局部尺度板房底子為C20。平常情況下內(nèi)無鋼筋,如有地形、地基特殊情況或板房有特殊要求,應(yīng)以技能部出圖為準(zhǔn)。
3. Concrete grade: the bottom of slab house is C20. Under normal circumstances, there is no reinforcement inside. In case of terrain, special foundation conditions or special requirements for prefabricated house, the drawing of skill department shall prevail.
4.底子澆注時(shí)間:彩鋼活動(dòng)房的底子澆注應(yīng)與慣例的混泥土澆注工藝一樣,不可減少工藝秩序。在底子澆注完成到板房裝配之間應(yīng)留有充沛時(shí)間,以確保混泥土到達(dá)必定的硬度。
4. Base pouring time: the base pouring of color steel activity room should be the same as the conventional concrete pouring process, which can not reduce the process order. Sufficient time should be left between the completion of the base pouring and the assembly of the board house to ensure that the concrete reaches a certain hardness.
5.要求:為保障裝配工期,裝配質(zhì)量和裝配后整潔美觀,在制造底子的同時(shí),把室內(nèi)地面也一并澆注完成,程度高度與底子一樣,在板房裝配完成后,在室內(nèi)鋪地板既方便,又整潔,也不會(huì)影響板房的質(zhì)量和外觀。室內(nèi)地板的高度應(yīng)比底子程度高度高出50MM,以確保雨水不會(huì)流入室內(nèi)和地圈梁的堅(jiān)實(shí)水平。
5. Requirements: in order to ensure the assembly period, the assembly quality and the neatness and beauty after assembly, the indoor floor is poured at the same time as the base, and the height is the same as the base. After the assembly of the board room, it is convenient and neat to lay the floor indoors, and it will not affect the quality and appearance of the board room. The height of the indoor floor should be 50 mm higher than the height of the base to ensure that the rainwater will not flow into the solid level of the indoor and ground ring beams.
只有把裝配地點(diǎn)和環(huán)境的要求達(dá)到了,裝出來的彩鋼活動(dòng)房才能堅(jiān)固耐用,更好的保證使用。
Only by meeting the requirements of assembly site and environment, can the color steel activity room be durable and ensure the safety of use.

聯(lián)系電話:18765446878

咨詢熱線:18765446878(微信同號)

地址:禹城市十里望鎮(zhèn)山東國際商貿(mào)港往南660米

備案號:魯ICP備2023024436號 魯公網(wǎng)安備37010202001695號 網(wǎng)站地圖|XML|TXT

微信二維碼

微信二維碼

亚洲人成无码网WWW| 亚洲乱码国产一区网址| 亚洲视频一区在线观看| 精品国产亚洲男女在线线电影 | 亚洲天堂免费在线| 亚洲免费在线视频观看| 亚洲一区二区高清| 亚洲精品第一国产综合精品99| 九九精品国产亚洲AV日韩| 亚洲精品动漫免费二区| 亚洲日本乱码卡2卡3卡新区| 亚洲综合激情五月丁香六月| 亚洲一久久久久久久久| 亚洲无mate20pro麻豆| 亚洲日韩精品无码专区加勒比☆| 亚洲综合无码一区二区痴汉| 亚洲影视自拍揄拍愉拍| 国产精品亚洲精品观看不卡| 亚洲日日做天天做日日谢| 亚洲性色精品一区二区在线| 亚洲精品av无码喷奶水糖心| 亚洲国产成人AV在线播放| 女bbbbxxxx另类亚洲| 亚洲国产午夜中文字幕精品黄网站 | 亚洲国产成人在线视频| 久久狠狠爱亚洲综合影院 | 亚洲五月综合缴情在线观看| 亚洲国产综合无码一区| 亚洲AV日韩AV永久无码久久| 综合自拍亚洲综合图不卡区| 亚洲成综合人影院在院播放| 97久久国产亚洲精品超碰热| 亚洲精品久久无码av片俺去也| 日韩成人精品日本亚洲| 久99精品视频在线观看婷亚洲片国产一区一级在线| 亚洲人成无码网WWW| 亚洲第一极品精品无码久久| 久久久久亚洲精品日久生情 | 中文字幕亚洲电影| 久久精品国产亚洲AV麻豆~| 亚洲熟妇色自偷自拍另类|