工地工程板房搭建有哪些施工要求

來源:http://www.yunhu3.com 日期:2022-11-02 發布人:
工程板房安裝須具有在技術監督備案才能進行施工,并且工程板房的生產企業,應提供完整的建筑結構安裝圖紙、產品出廠合格證等。那么,工地濟南工程板房搭建有哪些施工要求?下面跟小編一起來了解一下!
The installation of engineering plank houses can only be carried out after being filed in the technical supervision, and the manufacturer of engineering plank houses shall provide complete building structure installation drawings, product factory certificates, etc. So, what are the construction requirements for the construction of plank houses in Jinan Project? Now let's get to know with Xiao Bian!
一、工地工程板房搭建施工要求
1、 Construction requirements for construction of plank house on construction site
(1)工程板房安裝,應由具有相應資質的施工企業、或生產廠家承擔。安裝單位應根據合同文件、安裝圖紙以及相關標準編制安裝施工方案,并按方案組織實施。
(1) The installation of engineering plank houses shall be undertaken by construction enterprises or manufacturers with corresponding qualifications. The installation unit shall prepare the installation construction scheme according to the contract documents, installation drawings and relevant standards, and organize the implementation according to the scheme.
(2)工程板房層數多不應超過2層,每層建筑面積不應超過300㎡,并且大于200㎡時,其疏散樓梯的數量不應少于2部。房間門樓梯的大距離不應大于25m,樓梯的凈寬不應小于1.1m。宿舍房間的建筑面積不應大于30㎡,房間門應朝疏散方向開啟。
(2) The number of floors of the project plank house shall not exceed 2, and the building area of each floor shall not exceed 300 m2, and when it is more than 200 m2, the number of evacuation stairs shall not be less than 2. The large distance from the room door to the stair shall not be greater than 25m, and the clear width of the stair shall not be less than 1.1m. The building area of the dormitory room should not be more than 30 m2, and the room door should be opened towards the evacuation direction.
(3)工程板房安裝完成后,應由安裝單位進行自檢,經自檢合格后應由施工總承包單位組織監理單位、使用單位、安裝單位進行聯合驗收,合格后方可交付使用。
(3) After the installation of the prefabricated house, the installation unit shall conduct self inspection. After the self inspection is qualified, the general contractor shall organize the supervision unit, the user and the installation unit to conduct joint acceptance, and the house can be delivered for use only after it is qualified.
濟南工程板房
二、工程板房硬性要求——防火
2、 Hard requirements for engineering board room - fire protection
(1)所有臨時工程板房材質須為新型阻燃材料,臨時工程板房建筑層數都不超過2層,并按要求設置疏散樓梯。
(1) All temporary project plank houses must be made of new flame retardant materials. The number of floors of temporary project plank houses shall not exceed 2, and evacuation stairs shall be set as required.
(2)臨時工程板房防火部位須配置合格、有效、數量充足的滅火器材,并專人負責定期檢查、維護、保養。
(2) Qualified, effective and sufficient fire fighting equipment shall be provided at the key fire prevention parts of the temporary project plank house, and special personnel shall be responsible for regular inspection, maintenance and repair.
(3)臨時工程板房用電須符合《施工現場臨時用電技術規范》要求,宿舍、辦公用房內不允許使用大功率電器和私拉亂接電線等。
(3) The electricity used in the temporary project board room must comply with the requirements of the Technical Code for Safety of Temporary Electricity Use on Construction Site. It is not allowed to use high-power electrical appliances and connect wires without permission in the dormitories and office rooms.
(5)臨時工程板房搭設完畢后,要經過建設、監理、施工單位及生產廠家對臨時用房的結構性能、室內用電、消防設施等共同進行驗收,驗收合格后方投入使用。
(5) After the erection of the temporary project plank house, the construction, supervision, construction unit and manufacturer shall jointly check and accept the structural performance, indoor electricity, fire fighting facilities, etc. of the temporary house, and put it into use after passing the check and acceptance.
(6)不得攜帶易燃易爆物品進入宿舍、辦公用房、會議室等人員密集的地方。
(6) Inflammables and explosives shall not be carried into the dormitory, office space, meeting room and other crowded places.
工地工程板房搭建有哪些施工要求?我們從兩大方面來為您講解了這個問題,您在搭建時要多注意細節問題,保障工程的質量才行。更多相關內容就來我們這里http://www.yunhu3.com咨詢了解吧!
What are the construction requirements for the construction of plank houses on the construction site? We explained this problem to you from two aspects. You should pay more attention to the details when building to ensure the quality of the project. Come here for more information http://www.yunhu3.com Ask and understand!

聯系電話:18765446878

咨詢熱線:18765446878(微信同號)

地址:禹城市十里望鎮山東國際商貿港往南660米

備案號:魯ICP備2023024436號 魯公網安備37010202001695號 網站地圖|XML|TXT

微信二維碼

微信二維碼

亚洲成A人片在线观看无码不卡| 日韩亚洲AV无码一区二区不卡 | 久久狠狠高潮亚洲精品| 亚洲精品国自产拍在线观看| 在线观看亚洲网站| 亚洲乱色伦图片区小说| 亚洲色一区二区三区四区| 国产人成亚洲第一网站在线播放| 亚洲国产成人九九综合| 亚洲三级视频在线| 亚洲午夜久久久久久尤物| 日韩精品亚洲专区在线观看| 伊人久久大香线蕉亚洲五月天| 亚洲人成影院在线观看| 亚洲中文字幕成人在线| 国产亚洲精品自在线观看| 久久99亚洲综合精品首页| 中文字幕亚洲天堂| 亚洲日韩欧洲无码av夜夜摸| 精品国产综合成人亚洲区| 亚洲VA成无码人在线观看天堂| 亚洲国产人成网站在线电影动漫| 久久亚洲精品成人av无码网站| 亚洲综合视频在线观看| 亚洲制服在线观看| 亚洲综合在线一区二区三区| 亚洲最大天堂无码精品区| 亚洲国产精品自在自线观看| 国产综合激情在线亚洲第一页| 亚洲精品国产V片在线观看| 久久亚洲国产精品五月天婷| 久久亚洲高清观看| 91亚洲导航深夜福利| 亚洲人成电影网站| 亚洲精品无码不卡在线播放| 国产在亚洲线视频观看| 亚洲日本一区二区三区在线不卡| 亚洲日韩精品一区二区三区无码 | 亚洲欧洲久久久精品| 亚洲精品无码mv在线观看网站| 亚洲av女电影网|